How does the industrial drawing agent work out BOM and cost?
Yes, and every step has a basis. An ontology gives parts, features and operations one vocabulary. AI reads materials and quantities from the 3D assembly and the 2D bill of materials, then computes cost from process cycle time. BOM conflicts are flagged; missing unit prices are left empty.
Where the BOM comes from
| BOM field | Source | On conflict or absence |
|---|---|---|
| Part number and name | 3D assembly structure / 2D parts list | Differences are flagged, never merged automatically |
| Quantity | 3D assembly count / rows of the parts list | Listed as a difference and confirmed by a person |
| Material grade | Part attributes + knowledge graph material library | Left empty with the candidate source noted |
| Surface and heat treatment | Technical requirements + knowledge graph process | Recorded verbatim when it only appears on the drawing |
| Standard and bought-out parts | Part number and specification | Extracted numbers feed purchasing and outsourcing |
How cost is computed
Material cost multiplies the grade and quantity in the BOM by the unit price held in the knowledge graph. When the price is missing the field stays empty and the source is named, rather than a nearby price being picked.
Process cost adds up the cycle time of the operations AI routes. Machining is calculated from cutting parameters and geometry; assembly and inspection are estimated in hours.
What comes out is a quote review sheet, not a final quote. Unit prices and hours are confirmed by process and purchasing before they go into the ERP or the quoting system.
How this differs from plain drawing recognition
Plain recognition only returns fields. Here the ontology comes first, so a field carries its unit, tolerance and operation; the knowledge graph matches materials and cutters, so AI knows which operation a hole belongs to and how its cycle time is derived.
Geometry and cycle time come from calculation and rules. AI only writes the explanation and marks the gaps.
Related pages
All questions · Industrial Drawing Agent · Smart manufacturing · Online trial
Frequently asked questions
Q: Can the BOM and cost go straight into a quote?
No. The BOM and the cost are a review sheet: unit prices and hours are confirmed by a person, then written into the ERP or the quoting system.
Q: What if the material unit price is missing?
The field stays empty and the source is named; a nearby price is never used instead. Unit price is commercial data, filled in by purchasing or finance.
Q: How accurate is the cycle time AI computes?
Geometry, dimension-chain closure and cycle time come from calculation and rules, and the parameters are traceable. Hour-based results are reviewed by a process engineer.
Q: Can one person try it first?
Yes. Upload one assembly drawing in the online trial and check whether the BOM fields and the cost sheet add up before talking about local deployment.