Case studies

All cases retain internal file numbers; the desensitized version does not display the customer's full legal name and production line details when it is released to the public.

Manufacturing · 3D drawings, BOM and process disassembly

Challenge: Mixed native CAD and scans; 3D assemblies out of sync with 2D drawings; BOM repeatedly realigned between design and ERP; routing / work instructions re-keyed with slow change propagation.

Architecture: Drawing foundation model (3D/2D + BOM) → review workbench (BOM diff, routing draft) → MES / process-route APIs; model version, primitive and field lineage land in the audit store.

Timeline: 8-week pilot, 16-week line rollout (incl. data governance).

ROI: ~74% less process-prep labor; ~31% fewer monthly rework tickets (same-batch baseline).

Quote: "We can open any field back to the source graphic—far fewer arguments in meetings." — Process manager (ref. 2025-MFG-08)

Logistics industry · Freight forwarding mail and documents

Challenge: Night-shift staff re-handle the same emails; booking and customs data scattered across mailboxes.

Architecture: Multi-agent stack + freeze-to-send approval queue; project-scoped file vault.

Timeline: 6 weeks joint integration, 4 weeks pilot.

ROI: −2 clerical FTE (night shift); ~58% faster anomaly triage.

Quote: "The approval preview is exactly what goes out." — Head of operations (ref. 2025-LOG-03)

Electronics manufacturing · Visual re-inspection

Challenge: High SKU churn; rule-based vision is expensive to maintain.

Architecture: Edge inference + central training queue; defect taxonomies hot-updated.

ROI: Miss rate 1.2% → 0.35%; ~35 cold-start samples per new SKU.

Quote: "We cut over the same night as the line change." — Quality manager (ref. 2025-CV-11)

Book a case review meeting