How does a drawing review result trace back to a dimension?

It traces back to the drawing entity. Review rules name the standard clause they cite, and AI maps a violated clause back to the specific entity and page, so every result opens the source drawing. Fields that do not match the ontology or the knowledge graph are left empty and marked as insufficient input.

Try a drawing online Industrial Drawing Agent

What a review result carries

ResultBasisWhat it opens
FailThe standard clause the rule citesThe entity, the page and the dimension callout
Needs reviewThe rule matched but the reading is not confident enoughEntity position and candidate dimensions
Insufficient inputA missing annotation or ontology fieldThe list of missing items and their source

What gets reviewed

Whether dimension chains and tolerance chains close; whether fits and geometric tolerances conflict; drawing completeness, covering the parts list, technical requirements and datum callouts; and manufacturability, covering tool reach, minimum wall thickness and clamping space.

What goes to a person

When a rule matches but the reading is not confident enough, the item is marked for review; insufficient input is listed on its own. Neither counts as a pass, and the system does not decide them on a person's behalf.

Once confirmed, the results go back to PLM or MES together with the entities, and the rule version used at the time is kept.

Frequently asked questions

Q: How far back does a review result trace?
To the drawing entity and the page. Each result carries the entity position, the dimension callout and the standard clause cited, and opens the source drawing.

Q: How is insufficient input told apart from a pass?
Insufficient input is listed on its own with the missing annotation or ontology field named, and it does not count towards the pass rate.

Q: Who sets the review rules?
Process or quality confirms the standard clauses and writes them into the ontology. AI only compares against the rules; it does not interpret the standard itself.

Q: Can confirmed results be written back to PLM?
Yes. Confirmed results go back to PLM or MES together with the entities, and the rule version is kept.